Summer aftermatch
I guess it’s finally time to do the aftermatch of the summer todo.
The final result is satisfactory. I wasn’t lazy but I could have done better. The biggest trips were done (trekking, municipality tour), I mountain biked enough and did also some smaller things. In work side I was too lazy, but on the other hand for school I gave more effort than ever before. Actually the Embedded system is also passed for 95% sure but the credits are still missing. Some of those undone items were not totally just up to me so I don’t take the entire responsibility of the rowing for example.